REQUEST FOR PROPOSAL FOR PILOT PROJECT ULTRA SONIC METER SOFTWARE SYSTEM
The Village has issued a Request for Proposal for a Ultra Sonic Meter Software System Pilot Project
RFP Residential Meter Pilot and Main Project-DRAFT 4-updated w Ultrasonic Meter PDF>>
QUESTION: A proposed contractor asked in regard to the remote shut off valve if the line will have to be cut to install?
ANSWER: To install the remote shutoff the line may need to be cut for meter installation in the building.
QUESTION: Is there a controlled water shut off to avoid flooding and water cleanup if so?
ANSWER: For the times that an installation is scheduled, the Public Works permit process will require a VTSV employee to stand by and assist to shut off the In-Road cutoff valves.
QUESTION: Will the Village be conducting its own installation?
ANSWER: The Village expects the Contractor to install, but Village Staff will need to be instructed on how to conduct installation. The Village does not plan to hire a separate contractor .